Shared Platform Specification
All 3 models in this series share one electrical and radio platform. The table below is transcribed from the 2026 printed catalog and the forrinx.com listing; the only variables between models are the faceplate and housing finish shown in the next table.
| Rated input | 10 A AC 125 V, 50/60 Hz (SH-22 power strip series) |
|---|---|
| Maximum load | 10 A in total / 10 A resistive 125 V max 1250 W |
| USB output | 5 V / 2.4 A in total, 4 USB ports (SH-22 series) |
| Connectivity | Wi-Fi / BLE / Zigbee |
| App | Tuya Smart / Smart Life |
| Third-party compatibility | Apple Home, Google Home, Amazon Alexa, SmartThings, Matter |
| Protection & control | Overload protection, surge protection, timer, countdown, independent outlet control |
| Certification | CE / FCC / RoHS |
| Operating environment | -20 C to 55 C, relative humidity 10%-90% |
Model Differences
The mechanical and radio core is identical across the series, and the 2026 catalog prints a single shared parameter set for the whole line. The difference between members is the faceplate and housing finish - request samples to compare the exact appearance of each model before committing to a SKU.
| Model | What differs | Source |
|---|---|---|
| SH-03US (web ref. SH03US) | US pin standard; Matter ready | 2026 catalog |
| SH-03EU (web ref. SH03EU) | EU pin standard; Matter ready | 2026 catalog |
| SH-03UK (web ref. SH03UK) | UK pin standard; Matter ready | 2026 catalog |
Model-by-Model Guide
Each model below has its own positioning and best-fit scenario, written so a buyer can tell at a glance which SKU to lead with. Where a note is a placement or channel recommendation rather than a printed specification, it is marked recommended.
SH-03US (web ref. SH03US)
Positioning: The US-pin SH-03, for the North American retail channel.
Best fit (recommended): Recommended as the US launch SKU for a Matter smart-plug range: one certified electronics platform with the US plug fitted, so a brand enters the US market without a separate development cycle.
SH-03EU (web ref. SH03EU)
Positioning: The EU-pin SH-03, for European retail and energy channels.
Best fit (recommended): Recommended for the EU channel where Matter and Smart Life interoperability is a shelf requirement; the same app and voice ecosystem is retained with the EU plug fitted.
SH-03UK (web ref. SH03UK)
Positioning: The UK-pin SH-03, for the UK and Ireland retail channel.
Best fit (recommended): Recommended for UK retailers who need a locally pluggable Matter plug; listing SH-03US/EU/UK together gives a single-brand, multi-region smart-plug wall.
Key Characteristics
Regional plug standards for US, EU and UK markets
Configurable rating, USB-A / USB-C and multi-outlet layout
Shared core board with market-specific approvals
Custom faceplate, colourway, logo and retail packaging
Per-unit functional test before packing
Applications
- Retail smart-home private label
- Energy monitoring bundles
- Hospitality and property retrofit
- Utility and distributor promotional programmes
OEM / ODM Options
- Housing / faceplate / colourway
- Logo, artwork and retail packaging
- Plug standard and regional configuration
- Firmware identity, chime or alert behaviour
- Bundle / kit composition
- Documentation and multi-language inserts
Downloads & Next Steps
Datasheet, compliance file and 2026 catalog are released on request so that you receive the current revision. Tell us the target market and estimated volume and we will reply with a written feasibility view within one business day.
Frequently Asked Questions
What is the minimum order quantity?
MOQ depends on the model, whether an existing housing is used and the level of customisation. Send the model, target volume and market and we will confirm it in writing.
Can we request samples?
Yes. Samples from existing platforms are typically prepared within 5-7 working days; custom appearance samples follow the ODM schedule.
Do you accept factory audits?
Yes. Buyer and third-party factory audits are welcome, and social and quality audits are supported.
Will you sign an NDA?
Yes, before drawings or commercial details are exchanged.
Who owns the tooling?
Tooling ownership and NRE amortisation are agreed in writing at scoping. We do not assume ownership of a customer-funded tool.


